
ADUs & additions · Salt Lake County
ADU and room additions in Salt Lake County
A backyard ADU, a basement apartment, or more room on the home you already own. One licensed Utah contractor checks the zoning, designs the space, pulls the permits and builds it to tie into the house.
What is involved
Adding space starts with what the lot allows
Adding to a home is different from remodeling inside it. Before anything is designed, the lot and the city’s rules set the limits: the setbacks from the property lines, how much of the lot can be covered, and whether a separate unit is even allowed. Getting that right first is what separates a project that gets permitted from drawings that go in the bin. We start there, so the design we hand you is one you can actually build.
From there it is structure. An addition needs its own footings and foundation, framing that ties into the existing house, and floor and roof lines that line up with what is there. A basement apartment needs egress, ceiling height and a separate entrance. A detached ADU is a small building of its own, with its own kitchen, bath and utilities run out to it. All of it is permitted work, because all of it is structural.
Homeowners across Salt Lake County add space for a lot of reasons: a growing family in Sandy or Draper, an aging parent who needs a place close but private, or a basement that could pay for itself as a rental. Whatever the reason, you see the design and 3D renderings, with a written price, before the first shovel goes in the ground.
What we handle
From zoning to finishes, under one contract
Backyard ADUs
A detached accessory dwelling unit in the yard, with its own kitchen, bath and entrance, for family, guests or rental where your city allows it.
Basement apartments
An unfinished or dated basement turned into a legal living unit, with an egress window, the right ceiling height and a separate entrance.
Room additions
A main-floor bump-out, a full room addition or a second story, framed to tie into the house you already own and add real square footage.
Zoning checked first
Setbacks, lot coverage and whether a unit is allowed on your lot, confirmed with your city before we design anything you cannot build.
Structure and foundation
New footings and foundation for an addition, structural tie-ins to the existing house, and floor and roof lines that match what is there.
Utilities extended
Heating, electrical and plumbing run out to the new space, with the panel and systems checked to carry the added load.
Choices that shape the result
How the new space meets the old

The decisions that make or break an addition are the ones at the seam between new and old. A floor that steps up an inch because the heights were not matched. A roof addition that reads as an afterthought because its pitch and overhang do not follow the house. A basement unit with a ceiling too low to feel like a home. We plan these joints carefully, because the measure of a good addition is that you cannot tell where the original house ends.
The other early decision is use. A space for a family member leans toward single-level access and an easy connection to the main house. A rental leans toward privacy, a separate entrance and its own utilities. An addition for your own family is about flow into the rooms it touches. We design around the use you tell us, confirm it against what the lot and your city permit, and show it to you in 3D before we build it.
How the project runs
From the first visit to the finished space
- 01
Free in-home visit
We look at the house, the lot and the basement or yard, measure, and talk through what you want to add and why. Zoning gets a first look here.
- 02
Design and a written price
A design that fits your lot's rules, 3D renderings and material selections, then an itemized estimate, so the addition is settled before the dig.
- 03
Permits
We prepare the structural drawings, confirm zoning and file the building permits with your city or county, and we meet the inspectors through the stages.
- 04
The build
One project manager runs the job, from footings and framing to the finishes. The existing home is protected and the site is cleaned each day.
- 05
Walkthrough
We go through the finished space with you, test the new systems, and close out every item before we hand it over.
Questions
ADU and addition questions
Can I build an ADU on my lot?
It depends on your city. Many Salt Lake County cities allow an accessory dwelling unit on a single-family lot, but the rules for size, setbacks, parking and whether a detached unit is permitted differ from one city to the next. We check your city's zoning before we design anything, so you are not paying to draw a unit the lot cannot carry.
What is the difference between an ADU, a basement apartment and a room addition?
An ADU is a full, separate living unit with its own kitchen, bathroom and entrance, either detached in the yard or built inside the home, such as a basement apartment. A room addition adds space to your existing living area, like a larger primary suite, a bigger kitchen or a new family room, without being a separate dwelling. We build all three, and the right one depends on how you want to use the space and what your lot allows.
Can you turn my basement into an apartment?
Yes, this is one of the most common projects we take on. A legal basement unit needs an egress window in each bedroom for escape and light, adequate ceiling height, and usually a separate entrance along with its own kitchen and bath. We assess what your basement has at the first visit and design the unit to meet the requirements, then permit and build it.
Will an addition match the rest of the house?
That is the goal, and it is harder than it sounds. We match the floor heights so there is no step between old and new, tie the new roof into the existing one, and match the siding, trim and windows so the addition reads as part of the house rather than a box bolted onto the back. We show you the match in 3D before we build.
Do you handle the zoning and permits?
Yes. Troy Design & Build confirms the zoning for your lot, prepares the structural and building drawings, and files the permits with your city or county building department. An addition or an ADU involves structure, so these projects are permitted work, and we meet the inspectors at each stage.
How long does an addition or ADU take?
Because these projects add structure, they generally run several months of construction, and the span depends on the size and whether it is a basement conversion, an addition or a detached unit. Design, zoning review and permits come first. You get a written schedule before the work starts.
Free estimate
Start your addition with a free in-home estimate
Tell us what you want to add and where. We come look at the lot, talk it through, and send an itemized price in writing.
Licensed Utah general building contractor 14008577-5501. Look us up any time at Utah DOPL.